PRE-PROD EVIDENCE
31/54
Target 51/54 (94.44%)57.4%PASS
NEXGEN GRC / PROGRAM CONTROL
20 additional controls must reach PASS to meet the 51/54 gate, with zero mandatory FAIL or unresolved RED controls.
Pipeline evidence, exact-head merge gates and environment boundaries now live inside the same executive command surface.
1 succeeded
0 running
0 failed
2 stale bases
Only the current PR head and jobs that actually executed count as merge evidence. Superseded, cancelled and silently skipped work never becomes green.
Unknown remains unknown. A merge decision still requires the current base, no conflict, required executed jobs, review policy, report/index lifecycle, migration journal when applicable, and no RED/HOLD.